The project was specifically designed for soap opera stages, providing a permanent home for Germany’s most popular daytime television drama.
The building’s design needed to fit into the predominant 30s style ambience of the historic studio. The building in-cludes 5 state of the art soundstages with admini-stration, production and adjacent post production facilities.
Gerhard W. Mayer was the lead architect on this project.